Magnet ID :     Background
Directory : S:\magdata\LCLS-II\Phase Shifter\Background\Stretched Wire SXR\DATASET0001\Final Results\Stretched Wire
   
Date : 06-27-2018
Time : 10:33:49 - 11:38:11
Operator : VV
   
Project : DUMMY
Device Type : Phase Shifter
Run Number : 1
Data Type :
Run Comment : rewired (rack is back next to the bench)
   
gap I1Y I2Y I1X I2X
-
-10.9 1.2 (5)
-2.7 0.3 (5)
1.0 0.8 (5)
0.2 0.5 (5)

integral gap -02.00;+00.00 -01.00;+00.00 +00.00;+00.00 +01.00;+00.00 +02.00;+00.00
I1Y -
-12.6 1.2 (3)
-10.6 0.2 (3)
-11.4 0.9 (3)
-10.9 0.3 (3)
-11.2 1.0 (3)
I2Y -
-3.1 0.3 (3)
-3.5 0.4 (3)
-3.1 0.3 (3)
-3.2 0.7 (3)
-3.1 0.3 (3)
I1X -
-0.1 1.6 (3)
1.6 0.7 (3)
1.4 1.0 (3)
1.2 0.1 (3)
1.7 0.7 (3)
I2X -
0.2 0.4 (3)
0.3 0.3 (3)
0.2 0.4 (3)
0.2 0.1 (3)
0.3 0.4 (3)

integral gap +00.00;-02.00 +00.00;-01.00 +00.00;+00.00 +00.00;+01.00 +00.00;+02.00
I1Y -
-9.4 1.1 (3)
-8.8 3.4 (3)
-7.5 2.4 (3)
-10.7 0.4 (3)
-8.2 3.0 (3)
I2Y -
-3.3 0.5 (3)
-2.9 0.4 (3)
-3.3 0.5 (3)
-2.6 0.5 (3)
-3.1 0.1 (3)
I1X -
0.7 1.6 (3)
-2.9 1.2 (3)
-1.1 1.5 (3)
-1.6 2.6 (3)
-2.3 2.1 (3)
I2X -
0.1 0.6 (3)
-0.3 0.1 (3)
-0.3 0.3 (3)
-0.3 0.0 (3)
-0.2 0.3 (3)

   
Magnet ID :     Background
Directory : S:\magdata\LCLS-II\Phase Shifter\Background\Stretched Wire\DATASET0001\Final Results\Stretched Wire